We are proposing two different types of housing
for this property. The lots directly adjacent to the freeway are
below the freeway road elevation and the majority of the freeway
noise passes overhead. We are proposing to develop for sale housing
with Fourplex and Duplex style housing in this area. They can
be purchased as an owner occupied master unit with three rental
units attached. That can be set up for retired buyers who want
to own and manage their own rental units and live in the master
unit. Or the buildings can be sold as a four unit condominium
building with individual ownership for each of the units. We have
been in contact with business owners and municipal agencies that
are interested in providing “Employee Assisted Housing”
utilizing the fourplex concept. for Work Force Housing. We are
including duplex style housing in the same area for first time
buyers in the Work Force economic range. We are designing these
units with sweat equity expansion in mind as the owners family
grows. With state and federal down payment programs young people
can move in with little or no money down and have ownership in
their own residence. All the Fourplex and Duplex buildings will
be maintained by a condominium association, which will keep the
project always looking good and give control on the number of
people allowed to live in each unit and set rules of behavior
for the development. This will provide an incentive for the upgrading
the local neighborhoods housing as well.

On the reduced slope area above the for sale housing
we are proposing an apartment complex of 48 units with rents in
the Workforce market range. The building will be designed so that
the patios and living areas are facing away from the freeway and
shielded from the traffic noise. The buildings are all designed
and constructed to condominium standards and have three stories
of living space with garages on the lower daylight basement. All
these buildings are fully fire sprinklered. The center two buildings
will be elevator equipped so that all the units are handicap available.
These building will have views of the local area and some view
of the lake. The Landscaped courtyard to the East of the buildings
has a playground and large open space for recreation use. A recreation
building is provided and will be available for all the occupants
of the development. The recreation building will be designed so
that a community day school can be setup for the working families.
The project will have its own wireless internet system available
to the workforce occupants for a minimal cost. The system can
have mini-cam’s at the day school for the participants to
view the children’s activities when ever they choose. The
community network can be utilized for self help programming to
facilitate this market group to better their educations. Approximately
`10% of the rental units will be affordable and qualify for subsidy
rent programs.
The development is location is close to schools and local recreation
areas. The project will provide a bike trail connecting the Project
to the neighborhood to the north and provide access to the local
elementary school
The development will require an annexation of
a small portion of the property into the City as presently it
is in the County. The zoning being requested is R-8 which will
allow us to build the cluster and multifamily buildings. The actual
density for the project is 6.5 units to the Acre and will be built
under the Planned Unit Development format. The entrance will be
from Pennsylvania Ave. and 23rd St. with a gated entrance to discourage
excess traffic and provide a sense of security for the residents.
A limited emergency exit to Lilac Lane is proposed for access
by the Fire and Police service vehicles. It is anticipated that
public transportation via local bus service can be added to the
site to provide employee transportation to local businesses.
The streets will be private streets maintained
by the association , the main access from Pennsylvania Ave. street
will have a 10 ft. bike and pedestrian way on the East side and
two traffic lanes with parking on the West side. This entrance
will be gated to control traffic into and the project and give
the occupants a sense of security. The driveway access to the
apartment site will be graded at a maximum grade of 8% for normal
and emergency access and the upper driveway will have parking
on the West side. The parking area will be provided with curbs
at the hillside edge and boulders to limit accidents. Each of
the apartment units will have one covered parking spaces and additional
parking provided on the driveway side. See attached schedule of
parking and unit breakdown.
This property is in the “Hillside Ordinance”
boundary and the slope areas have been left natural with minimal
grading at the toe of the slope as it abuts the individual lots.
The trees in these areas will provide a natural screen between
the development and the adjacent residences on each side of the
project. The Fernan Hill roadway is well above the highest roof
line of the buildings and will not be visible to anyone driving
up or down the roadway. The only way to see the project would
be to stop and get out of the can and look over the bank.
The wetland and flood control basin area at the
North entrance will be upgraded to provide added water storage
capacity for the spring runoff and landscaped with indigenes wetland
plants to create a pleasant entrance to the project. A larger
arched conduit will provide additional water capacity where the
new roadway crosses the stream which will provide capacity for
the maximum flood flow. A formal application to the Corps of Engineers
will be made after preliminary approval is received for the project.
The entrance wetland is also in the 100 year flood zone. All improvements
will be located above the 100 yr flood mark of el. 2165 at the
stream crossing. The extreme limits of the flood zone will be
reinforced with landscape boulders to provide protection to the
local area and blend into the natural landscape of the project.
The slope at the South edge of the wetlands area will be left
natural to provide a landscape screen to the local neighbors.

The sewer and water system have been designed
to city standards with the apartment area having a private gravity
sewer system that connects to the public system in the street.
The area south of the apartment access road will be served by
a pressurized main sewer with grinders and pumps to move the sewage
to the gravity connection. Future connection capability will be
provided for the residences in the Foss subdivision. The project
has been reviewed by the fire department and all the required
fire hydrants and turnarounds meet the local standards. The maximum
grade on any street is 8% for short distances. Storm water is
collected in grassy swales between the fourplex and duplex lots
and the overflow is directed to the large swale area at the South
property line, which will also take occasional overflow runoff
from Highway 90 which is adjacent. The Northern properties swales
overflow will be directed to the wetlands area. A general storm
water overview design has been completed and the required areas
shown on the site plans.
The site has a preliminary Geotech review and
all slopes are within the recommend tolerances. See attached preliminary
report from Earth Systems Northwest. A wetlands review is also
included, see Environmental Inc. report. The traffic report on
Pennsylvania Ave and 15th street indicates no reduction in the
efficiency of the street and intersection by the additional traffic
created by this development.
We are requesting the building size for the apartments
be adjusted to allow larger building that will be required to
achieve the economic balance for workforce housing. We will have
two building of three stories and 18 units each and one building
of three stories with 12 units. The balance of the buildings on
the site are within the Cities standards. The PUD designation
is required to restrict the total number of units on the site
to the 82 proposed, not the greater number that would be available
under an R-8 zone.
The project will be developed in two phases.
Phase One the land North of the apartment driveway
Three fourplex lots 12 fourplex Units
Two Apartment buildings 30 Apartments
Project entrance and wetlands improvements
Gravity sewer system
Private street complete to apartments
Water service to phase one
All mass grading for site
Phase Two
Four fourplex lots 16 Units
Three Duplex lots 6 Units
One apartment building 18 Units
Recreation Building
Balance of water and sewer systems
Balance of private street
See the attached exhibit “PUD OVERVIEW”
for breakdown of land use and code modification with the project
building schedule. It is anticipated that the project would be
developed over a three to five year period depending on financing
and market forces.